UNDERESTIMATED - traduction vers arabe
Diclib.com
Dictionnaire ChatGPT
Entrez un mot ou une phrase dans n'importe quelle langue 👆
Langue:

Traduction et analyse de mots par intelligence artificielle ChatGPT

Sur cette page, vous pouvez obtenir une analyse détaillée d'un mot ou d'une phrase, réalisée à l'aide de la meilleure technologie d'intelligence artificielle à ce jour:

  • comment le mot est utilisé
  • fréquence d'utilisation
  • il est utilisé plus souvent dans le discours oral ou écrit
  • options de traduction de mots
  • exemples d'utilisation (plusieurs phrases avec traduction)
  • étymologie

UNDERESTIMATED - traduction vers arabe

UNEXPECTED INCURRED COSTS IN EXCESS OF BUDGETED AMOUNTS
Underestimate; Cost Overrun; Cost overun; Cost increase; Budget increase; Budget escalation; Cost overruns; Budget overrun; Over budget; Escalating costs; Escalating cost; Cost risk; Cost underestimation; Low balling; Cost increases; Underestimated; Cost under-estimation; Cost underestimations; Cost under-estimations

UNDERESTIMATED         

الفعل

أَصْغَرَ ; اِحْتَقَرَ ; اِسْتَحْقَرَ ; اِسْتَخَفَّ بِـ ; اِسْتَصْغَرَ ; اِسْتَقَلَّ ; تَهَاوَنَ ; حَقَرَ ; حَقَّرَ ; صَغَّرَ ; غَضَّ مِنْ ; قَلَّلَ من شَأْنِهِ أو أَهَمِّيَّتِهِ ; وَضَعَ ; وَضَعَ مِنْ

underestimate         
فِعْل : يبْخَسْ التقدير . يستخفّ بـ
UNDERESTIMATE         

الفعل

أَصْغَرَ ; اِحْتَقَرَ ; اِسْتَحْقَرَ ; اِسْتَخَفَّ بِـ ; اِسْتَصْغَرَ ; اِسْتَقَلَّ ; تَهَاوَنَ ; حَقَرَ ; حَقَّرَ ; صَغَّرَ ; غَضَّ مِنْ ; قَلَّلَ من شَأْنِهِ أو أَهَمِّيَّتِهِ ; وَضَعَ ; وَضَعَ مِنْ

Définition

underestimate
v. a.
Undervalue, underrate, misprize, rate below the true value, rate too low.

Wikipédia

Cost overrun

A cost overrun, also known as a cost increase or budget overrun, involves unexpected incurred costs. When these costs are in excess of budgeted amounts due to a value engineering underestimation of the actual cost during budgeting, they are known by these terms.

Cost overruns are common in infrastructure, building, and technology projects. For IT projects, a 2004 industry study by the Standish Group found an average cost overrun of 43 percent; 71 percent of projects came in over budget, exceeded time estimates, and had estimated too narrow a scope; and total waste was estimated at $55 billion per year in the US alone.

Many major construction projects have incurred cost overruns; cost estimates used to decide whether important transportation infrastructure should be built can mislead grossly and systematically.

Cost overrun is distinguished from cost escalation, which is an anticipated growth in a budgeted cost due to factors such as inflation.

Exemples du corpus de texte pour UNDERESTIMATED
1. They underestimated Maliki‘s sophistication and cunning.
2. "The Iranians shouldn‘t be underestimated," said Thurtell.
3. Meanwhile, almost everyone underestimated oil demand.
4. However, their importance should not be underestimated.
5. The Conservatives claim it underestimated by 1.5bn.